• Home
  • Training
  • Design
  • DNO Applications
  • Testimonies
  • About Us
    • Why Work With us?
    • Contact Us
  • Free Webinars
  • More
    • Home
    • Training
    • Design
    • DNO Applications
    • Testimonies
    • About Us
      • Why Work With us?
      • Contact Us
    • Free Webinars
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Training
  • Design
  • DNO Applications
  • Testimonies
  • About Us
    • Why Work With us?
    • Contact Us
  • Free Webinars

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

UK Grid Connection Applications

 Get connected. Without the guesswork.


We manage the technical and administrative path between your renewable energy project and the Distribution Network Operator, from early feasibility through to the connection offer.


BUILT AROUND YOUR PROJECT

Generation, storage and constrained export.

From a commercial rooftop solar array to a multi-technology site, we shape the application around how the electrical system will actually operate.


COMMERCIAL SOLAR PV
New generation systems and extensions to existing installations.


BATTERY ENERGY STORAGE
Standalone battery systems and solar-plus-storage projects.


EXPORT-LIMITED SYSTEMS
G100 export-limitation strategies and associated technical information.


LV AND HV CONNECTIONS
Project-specific coordination for low-voltage and high-voltage connections.


No project is too big or too small. From residential to utility scale, we can help.

From residential installations to large utility scale, we can help. 

how it works

01 FEASIBILITY

02 TECHNICAL SUBMISSION

02 TECHNICAL SUBMISSION

We review the site, proposed capacity, point of connection and operating intent. We then establish the correct application route before detailed work begins.


• G98 or G99 route review
• Proposed export capacity
• Generation and storage review
• Key risk identification
• Initial information-gap assessment

02 TECHNICAL SUBMISSION

02 TECHNICAL SUBMISSION

02 TECHNICAL SUBMISSION

We prepare a coherent DNO application pack containing the project information and engineering documents required for technical assessment.


• DNO application schedules
• Single-line diagrams
• Equipment specifications
• Inverter and battery information
• Protection details
• Export-limitation information

03 DNO COORDINATION

04 CONNECTION OFFER REVIEW

04 CONNECTION OFFER REVIEW

We act as the technical point of contact during the assessment process, responding to engineering queries and requests for further information.


• DNO query management
• Design clarifications
• Additional information requests
• Application progress tracking
• Coordination with the wider project tea

04 CONNECTION OFFER REVIEW

04 CONNECTION OFFER REVIEW

04 CONNECTION OFFER REVIEW

When the connection offer arrives, we translate its technical conditions, constraints and dependencies into a practical next-step plan.


• Connection conditions
• Permitted import and export capacities
• Network reinforcement requirements
• Protection and metering obligations
• Export limitations
• Design implications and next actions

FREQUENTLY ASKED QUESTIONS

When should we start the grid connection application?

When should we start the grid connection application?

When should we start the grid connection application?

 As early as practical. Connection constraints can materially affect system capacity, export strategy, equipment selection and the project programme. 


Early assessment reduces the risk of developing a design around capacity the network cannot provide. 

Can you guarantee the capacity we request?

When should we start the grid connection application?

When should we start the grid connection application?

 No. The Distribution Network Operator controls its network and determines the connection capacity it can offer.


Our role is to submit a technically coherent application, respond efficiently to engineering queries and help you understand the available options if the requested capacity is constrained.

What information do you need to begin?

When should we start the grid connection application?

What information do you need to begin?

• Site address
• MPAN, where available
• Proposed solar PV capacity
• Proposed battery capacity
• Inverter and battery selections
• Existing electrical information
• Proposed point of connection
• Single-line diagram, where available
• Intended import and export capacities


CONTACT US

Let's talk...

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

MBC Renewables Ltd

England, United Kingdom While we are based in the United Kingdom, we offer our services to a global audience. We welcome your enquiry. michael@middlemast.com gemma@middlemast.com info@middlemast.com Office +44 (0) 7784 150

Hours

Open today

09:00 – 17:00

Free Webinar
  • Training
  • Design
  • DNO Applications
  • Testimonies
  • Contact Us

 All content is under copyright of MBC Renewables Ltd. Unauthorised reproduction of content contained herein is forbidden. 


This website uses cookies.

We use cookies to analyse website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept